The plant was a duplicate of the Hopper 9 and Hopper 10 crushing plant projects previously delivered by a joint contracting group of Primero, RCR and OFI.
Our Projects

South Flank
Primero was engaged by Clough Australia to undertake turnkey design, construction and commissioning solutions for 4M litres of diesel fuel infrastructure at primary crushing areas 1 and 2, 800KL of diesel fuel infrastructure with the MEM precinct and additional lubrication storage and distribution infrastructure.

East Intercourse Island Light Vehicle Washdown
Primero was engaged by Rio Tinto to supply and install a new Light Vehicle (LV) washdown bay facility, inclusive of associated works at the site of an existing, insufficiently equipped LV wash facility at its East Island Intercourse (EII) operations workshop.

Marandoo SWFSF Pipeline and Electrical Upgrade
Included in Primero’s scope was the detailed structural, mechanical, piping, and electrical and communications design drafting, as well as supply and installation of all materials and equipment, including modifications to existing infrastructure and systems as required.