Scope of Works
Primero was engaged by Rio Tinto Iron Ore (RTIO) to design and deliver an additional fuel facility as part of the wider Yandi Sustaining Project. Primero provided a turnkey refuelling solution for the South Western mine junction, including tying into existing fuel infrastructure at the SW junction’s central fuel farm.
Scope of works included the design, supply, fabrication, delivery, construction and commissioning of the facility containing:
- 2x 110kl bullet tanks.
- Duty and standby fuel pumps.
- Line filtration.
- Unloading.
- AHS refuelling capability.