EDL engaged Primero to upgrade its Hill 60 power facility with an additional 2MW gas fired generator to boost power production and supply. Conducted in a brownfield environment, the challenge of the task lay with navigating and operating around existing services and infrastructure.
Scope of Works
Encompassed in the detailed scope of work was the design, fabrication and site installation of:
- Power generator systems including power generator installation and mechanical auxiliary systems.
- Fuel gas systems.
- Lube oil systems.
- Cooling systems.
- Compressed air systems.
- All electrical systems including:
- 33KV export.
- 415V auxiliary supply.
- HV installation.
- LV installation.