Our Projects

Pogo Expansion

Client
Category

Location
Commodity

Northern Star Resources Limited
Gold
Alaska, USA
Gold
Pogo Expansion Image 1 Pogo Expansion 1

Primero is engaged by Northern Star Resources to implement the Pogo Mine process plant upgrades to increase throughput. The main objective of the Pogo Expansion Project is to:

  • Increase milling capacity stepwise.
  • Improve or hold metallurgical recovery and performance.
  • Provide stability to process flows.
  • Increase the level of automation.
  • Reduce operator intensive duties.

SCOPE

  • Process design validation.
  • Debottlenecking of existing infrastructure (grinding, flotation tail, WTP and ORTW pumps, mill pinion, sag cube and pre-leach thickener control upgrades).
  • Design and installation of:
    • 18m insulated thickener and associated equipment.
    • Plate and frame filter, building and associated equipment.
    • Pre-rougher selective flotation unit and associated equipment.
    • Cement silo storage.
    • Bulk lime storage.
    • Coarse ore overflow storage.
    • Light, small power and HVAC.
  • Civil, structural, mechanical and electrical design as required.
  • Control system design and documentation.
  • Cost estimation.
  • Engineering, procurement and construction management.