Mt Holland Water Pipeline

Client
Category

Location
Commodity

Covalent Lithium
Critical Minerals
Mt Holland, Western Australia
Lithium
Covalent Water Pipeline Mt Holland Water Pipeline 1

Covalent required a freshwater source to service their concentrator at Mt Holland. Through participation in an Early Contractor Involvement (ECI) program with the concentrator design, Primero was invited to design a pipeline system. Following on from completing the design, Primero was invited to tender for the delivery of the pipeline and was subsequently awarded the work.

SCOPE:

Construction of:

  • Tie into the Mundaring to Kalgoorlie water pipeline.
  • Micro-tunnelling and sleeving beneath Great Eastern highway.
  • 1,000,000L break tank with duty standby pump station.
  • 250,000L booster tank with duty standby pump station.
  • 136km DN400 PN20 HDPE direct buried pipeline. Buried depth is a nominal 1.2m to the top of the pipe.
  • Directional drilling beneath gazetted roads and significant trees.
  • Control system using satellite communication.
  • Hydrotesting of entire 136km pipeline.
  • Commissioning of full system.

HIGHLIGHTS:

  • Construction of a 136km direct buried pipeline through the shire of Yilgarn with significant traffic management programme, community and stakeholder engagement.
  • The project had no recordable injuries or incidents.
  • The project delivered water to the client on schedule.
  • Successful design to construction execution with minimal owner team requirements.